Primavera P6

COURSE

DURATION

Primavera P6 Enterprise Project Portfolio Management

40 Hours

PROGRAMME OVERVIEW

The course is designed to make the participants a Project Management Professional. To build capability to manage large projects over millions of activity among young and growing managers. Primavera helps the designers to save millions of dollars every day globally. A course on Primavera will add professional value to the individual.

TARGETED TRAINEES

  • Engineering and Management Graduates
  • Project Management Students
  • Project Managers and Engineers.

PREREQUISITES

Engineering and Management experience.

COURSE OUTLINES

Introduction

  • Introduction about Project and its management.
  • About Project Management Information System

Introduction to Primavera

  • About Primavera
  • P6 EPPM Suite.
  • GUI of P6 Release 8.2 client

Projects

  • About Projects.
  • Creation of Project in client.

Calendar

  • Introduction to Calendar
  • Types of Calendar
  • Timescale

Work Breakdown Structure

  • Introduction to WBS
  • WBS Structure
  • Creation of WBS in Client.
  • Creating a WBS from a template
  • Configuring general WBS information

Activities

  • Introduction about an Activity
  • Assign Calendar to the Project in client.
  • Creating Activities
  • Configuring General Tab
  • Delete an activity.
  • Various methods to create an Activity

Relationships

  • Introduction about Relationships
  • Types of Relationship
  • Adding Relationships to the Activities in various methods
  • Apply Lead or Lag
  • Procedure to apply Lead or Lag

Scheduling

  • Introduction about Scheduling
  • About Critical Path Method
  • Procedure for Scheduling

Constraints

  • Introduction about Constraints
  • Constraints Categories
  • Types of Constraints
  • Procedure to apply constraints in client.

Codes

  • Introduction about Codes
  • Types of codes
  • About Activity Code & creation of code in client.
  • About Resource Code & creation of code in client.

Roles

  • Introduction about Roles
  • Creation of Roles
  • Assigning a Resource to a Role

Resources

  • Introduction about Resources
  • Types of Resources.
  • Define Resources
  • Assigning a Role to Resource

Assigning Roles & Resources

  • Assigning Roles to an Activity
  • Assigning Resources to an Activity

Resource Analysis & Leveling

  • Introduction about Analysis of a Resource
  • Resource Analysis
  • Different views of Resource Analysis
  • Resource Leveling

Documents

Baselines

  • About Baselines
  • Setting Baselines
  • Assign Baselines
  • Display Baselines

Updating Project Progress

  • Updating the Progress of Activities
  • Automatic Update
  • Manual Update
  • Display Progress line in Gantt chart

Tracking Project Progress

  • Introduction about Tracking
  • Earned Value Analysis
  • Earned Value Fields

Issues & Thresholds in Client

  • About an Issue
  • Creating Issues
  • Threshold
  • Using Issue Navigator

User Defined Fields

  • Introduction about User Defined Fields
  • WBS UDF
  • Activity UDF

Reports

  • Introduction about Reports
  • Procedure to take Reports
  • Create New Report Through Wizard
  • Report Group
  • Batch Report
  • Graphical Reports

Import & Export

  • Procedure to Import & Export
  • Check out & check in

CERTIFICATION

  • Certificate from Polyglot Institute approved by MOMP
  • Certificate from International CADD Centre